July 22, 2003
 

 

Getting the cap ready.

 

 




 

 

(Above) Welding on the Drilling Permit ID tag.

 

Before they closed it up, they let us have a look down inside the pipe. Then they measured to the top of the water level by dropping down a wrench attached to a 100 foot measuring tape. Our water level is about 50 feet down and our well depth is 170 feet.

 

 

 

Lastly they put the cap on and were done. We will meet others from Coonse Drilling when it's time for the pump to be installed.
(Below right) A bit of sand brought up from the bottom of the well.

 