July 30, 2003
|
|
|
After they had lowered the boom, Inspector Samuelson came by to approve the well. |
||
|
|
|
Mike K. was here also to oversee things. |
||
|
|
|
Above right & below - Installing and encasing the sprinkler valves. |
||
|
|
|
|
|
Then it was time to bury all the lines and smooth out the ground again. |
||
|
|
|
They scraped up the sand left from the well drilling first and put in in the bottom of the trenches before they covered them. Below left - The Inspector's Seal of Approval. |
||
|
|
|
|
|
Here's some views of our handy frost-free hydrant (still sealed) they also installed today in the circle turn-around. |
||
|
|