Page Sixty-Five
June 24, 2003
(Day 38 - since the foundation excavation)
 

 

Today the two shower units were installed. The downstairs was put in first.

 

 

 


 

 

The upstairs unit was a bit more challenging since it was larger and had to be carried up the stairs.

 

 

 

 

 

Then there was the problem of how to get it into the bathroom.

 

They removed three of the upright studs  - and the unit went right in.

 

 

 

A little adjusting before putting the studs back in, and the unit was in place.

 

The image on the left shows the upstairs shower from the back, and the one on the right shows both units from the side.