Page 104
July 22, 2003
 

 

Before too long they had a healthy stream of clear water gushing out the overflow tube. They let it run for a while before they unhooked the pump.

 

(above left) Pulling in the outflow tube anchor stake.
(below) Next the excess casing was cut off at about 2 feet from the ground.

 

 




 

 

Here the 10 foot section of outside casing is being lifted out and loaded up.

 

 




 

 

Then the gap left from the casing being removed was filled with Bentonite.

 

 

 

< Last Page <     < Home Page >     > Next Page >
< Navigation Page >


Contact M & M at: cds@mkmk.com