August 22, 2003
|
|
|
On Friday Gene (from Coonse Well Drilling) came by to install our pressure tank and hook up our water to the outside hydrant. |
||
|
|
|
Once he had the hydrant working, he suggested we hook a 3/4 inch diameter hose to it and let the water run a couple of days to clear the well. We did and it ran like a geyser at 55 pounds of pressure for two days. |
||
|
|
|
|
|
Rob came by also to put a coat of polyurethane on the half wall caps and handrails. |
||
|
|
|
|
And lastly for today's update, most of the plumbing fixtures were delivered. Here's the vanity sinks, two toilets and the garage utility sink. |
~