Page
Sixty-Five
June 24, 2003
(Day
38 - since the foundation excavation)
|
|
|
Today the two shower units were installed. The downstairs was put in first. |
||
|
|
|
|
||
|
|
|
|
The upstairs unit was a bit more challenging since it was larger and had to be carried up the stairs. |
||
|
|
|
|
||
|
|
|
|
||
|
|
|
Then there was the problem of how to get it into the bathroom. |
||
|
|
|
They removed three of the upright studs - and the unit went right in. |
||
|
|
|
|
||
|
|
|
A little adjusting before putting the studs back in, and the unit was in place. |
||
|
|
|
The image on the left shows the upstairs shower from the back, and the one on the right shows both units from the side. |
< Last Page
< < Home Page
> > Next Page
>
|