Page Ten
May 21, 2003
  

 

At the same time the concrete was being delivered and poured, additional dirt was being brought in for the back tree berm. This dirt came from a site about 8 miles away that Terra West was excavating. They will be bringing in around 28 truckloads over a two day period for a total of 600 yards. This dirt wasn't free, but even at $2 per yard it was a great price considering it is really good topsoil and the delivery fee was included.

 

 


 

< Last Page <     < Home Page >     > Next Page >
< Navigation Page >


Contact M & M at: cds@mkmk.com.