Page Twenty-Six
June 4, 2003     Final Septic Inspection
 

Wednesday morning we met with Jerry Davis from the Health Department for the final septic inspection. He was really nice and did a thorough job of looking everything over. After taking a bunch of measurements and verifying that all the trenches and field drains were done correctly, he gave us the OK to proceed with filling in the trenches.

 

Below shows Mike F. and Inspector Davis discussing the details.

 


 

 

After Inspector Davis left, Mike F. filled in all the remaining gravel.

 

Before he left for the day, he also dropped in the hay bales that will be spread out tomorrow separating the gravel from the topsoil.

 


 

 

These images just show a chip on the garage foundation that will need to be repaired later.

 


 

 

Here are the before and after pictures of the center driveway area showing the water & power lines.

 