May 28, 2003 (afternoon)
 

 

Idaho Power laid the conduit for the power line, cable and phone (no conduit for phone line) into the trench and covered it about half way to the top with dirt.

 

After they filled it up to the halfway mark, they covered it with the bright yellow warning tape.

 

 


 

 

By the end of the day Idaho Power had laid the conduit and tape, and covered the ends with the cement stand for the transformer.

 


 

 

Mike F. finished all the service lines to and from the house as well as running a power and water line to the center of the driveway area (top left) so we can install a lighted fountain after that area is landscaped.

 


 